done in situ,
take the weight of the sub-frame on a trolley jack, loosen the bolt, slightly lower the jack to remove the bolt and the upper half of the bush, replace the bolt, jack the sub-frame back up, remove the fixing bolt and replace the lower half of the bush, refit the bolt.......and do the same on the other side
that should do it
